Road Reconstruction

This project consisted of damaged sections of road which were milled out and replaced with 2.1 gravel on a number of sealed roads throughout the Tablelands. The works were then fully sealed with a two coat chip seal. Some medium formation grading was applied to areas of gravel roads.