This project was to rehabilitate and reconstruct damaged road and drainage infrastructure to Bloomfield Falls Road and Horsecrossing Road after the 2014 flood swept through the area.

Bloomfield Road

This project consisted of construction work of eight sites. Works consisted of earthworks, rock mattress, rock gabion, pavement, stormwater drainage, road signage, guide posts, line marking and associated works.

Horsecrossing Road

The project consisted of construction work of two major defect sites. Works consisted of gravel resheet, earthworks, drainage, rock protection, pavement, guide posts, signage and associated works. The major defects includes new road alignment which was constructed to the east of the existing road alignment and joined smoothly at each end with the existing road.