Airport - Mining - Other

This project included pavement repairs to approximately 22,500m2 of airstrip to allow ongoing use until Stage 2 could be undertaken. The works consisted of profiling existing failures, stabilising of in-situ material and replacement of unbound material where required. Extensive areas of sub grade failure rectified by using milled out pavement material which was recycled by stabilisation in stockpile and reused as subgrade repair.

Works were carried out in a remote and environmentally sensitive area on Cape York Peninsula. Conditions were at times extreme and strict client consultation and communication was necessary to achieve the optimum outcome.